Case Study: Marcolin achieves better production planning and reduced lead times with Cybertec CyberPlan

A Cybertec Case Study

Preview of the Marcolin Case Study

Marcolin plans and schedules eyewear production with CyberPlan

Marcolin, a leading global eyewear manufacturer, faced challenges in planning its high-end, craft-focused production due to its complex fashion-oriented production mix, numerous SKUs, and the need to balance many departments. To gain better control, reduce lead times, and improve visibility, the company chose to implement the CyberPlan Advanced Planning and Scheduling (APS) solution from vendor Cybertec.

Cybertec's solution provided Marcolin with a unified platform for forecasting, medium-term planning, and detailed daily scheduling. This integration streamlined operations, managed a complex supplier network, and seamlessly adapted through a major ERP change and significant company growth. The results for Marcolin included a reduction in lead time and set-up times, perfect management of its production mix, controlled warehouse levels, and an overall increase in production, all supported by excellent long-term collaboration with Cybertec.


View this case study…

Cybertec

32 Case Studies