Case Study: Infratil Energy Australia boosts peaking power capacity with Cummins turnkey generator solution

A Cummins Case Study

Preview of the Infratil Energy Australia Case Study

Infratil Energy Australia - Customer Case Study

Infratil Energy Australia, part of Infratil’s energy infrastructure business, needed additional fast-start peaking power capacity to meet short-term peak load demand in South Australia. To support this, Cummins Power Generation supplied a turnkey solution for the Port Stanvac Power Station using 36 C2250 D5 generator sets with QSK60 G4 engines, PCC control units, and a DMC 300 Master Controller.

Cummins Power Generation delivered, commissioned, and continues to operate and maintain the plant, which provides 57.6 MW of electrical output. The project also overcame a major site challenge by relocating, reconditioning, and recommissioning the existing Lonsdale Power Station nearby. The result is a low-utilization plant that operates about 50 hours per year, starts within five minutes, and meets strict noise and emissions requirements, including NOx levels below South Australian EPA minimums.


Open case study document...

Cummins

410 Case Studies