Case Study: Four Seasons Resort Koh Samui achieves reliable resort power with Cummins generator systems

A Cummins Case Study

Preview of the Four Seasons Resort Koh Samui Case Study

Four Seasons Resort Koh Samui - Customer Case Study

Four Seasons Resort Koh Samui, Thailand, needed a highly reliable power source to support its base load operations in a secluded island location where utility power was scarce. Cummins provided a power generator system built around 2 x C1675 D5 units with 1500 kVA prime power rating to help ensure continuous electricity for the resort.

Cummins implemented a single-source generator solution and arranged transport, on-site reassembly, testing, installation, and ongoing maintenance every 10 days. The result was more dependable power for the resort, a reduction in guest complaints about power issues, and greater confidence for Minor Corporation Limited in preventing power loss, while Cummins also delivered round-the-clock support and service.