Fogões Atlas keeps the flame alight with our energy!

Prime Power worked with Cummins to help Fogões Atlas, a leading Brazilian kitchen appliance manufacturer, address rising electricity costs and the risk of utility outages at its Pato Branco facility. The company needed a reliable power solution to support prime power, emergency standby, and peak power operations while improving overall energy efficiency.

Cummins supplied a 2.7 MVA diesel plant with six C400 D6 generator sets, equipped with PowerCommand PCC 3100 digital controls and a DMC 1000 parallel panel. The system helped Fogões Atlas cut energy expenditures by up to 30% during peak hours, maintain productivity, and gain greater protection against outages, supporting both cost savings and business continuity.