Case Study: Chamchuri Square Shopping Mall achieves reliable standby power with Cummins Power Generation

A Cummins Case Study

Preview of the Chamchuri Square Shopping Mall Case Study

Chamchuri Square Shopping Mall - Customer Case Study

Chamchuri Square Shopping Mall, serving as the Bangkok headquarters site for Total Access Communication PLC (DTAC), needed a reliable standby power solution for its high-rise facility and operations network. The challenge was finding equipment that could be delivered and installed on upper floors within a tight deadline, while also ensuring dependable long-term support. Cummins supplied generator sets and power electronics, including a C900 D5 and two C1675 DSA units with DMC 1000 controls.

Cummins implemented a complete power solution for DTAC’s Head Office and network site, integrating the new generators with existing equipment to strengthen electrical continuity. The company also provided 24-hour service support plus two years of preventive maintenance and warranty, helping DTAC secure reliable operations and minimize downtime. The result was a successful installation that met DTAC’s strict requirements and delivered a trusted, high-availability power backbone for its telecommunications network.


Open case study document...

Cummins

410 Case Studies