Case Study: Bitexco Financial Tower achieves reliable prime power with Cummins generator sets

A Cummins Case Study

Preview of the Bitexco Financial Tower Case Study

Bitexco Financial Tower - Customer Case Study

Bitexco Financial Tower in Ho Chi Minh City needed a highly reliable power source to support its 68-floor office skyscraper, with around 10,000 people expected to work there and critical building systems such as elevators and daily operations depending on uninterrupted electricity. Cummins supplied the project with five C2000 D5 generator sets, each rated at 1875 kVA prime power, designed for 6000V parallel operation with a medium-voltage switchboard.

Cummins implemented a power solution that integrated the generator sets with the building’s power management system to maximize use of available capacity and meet the tower’s base-load requirements. The result was a cost-effective, technologically advanced backup and prime power system tailored to the building’s needs, helping Bitexco Financial Tower operate smoothly and reliably while benefiting from Cummins’s 24/7 after-sales support.


Open case study document...

Cummins

410 Case Studies