Cummins
419 Case Studies
A Cummins Case Study
The customer, a well-established regional technology provider, faced the challenge of powering a major expansion of hyperscale data centers in Saudi Arabia to bolster the kingdom's digital infrastructure. They required a massive 73.2 MW of reliable power that could operate efficiently within a limited footprint and meet stringent UPTIME Institute specifications in a high ambient temperature environment. Cummins provided the solution with 30 DQLC and 6 DQCA enclosed generator sets.
Cummins Arabia delivered a comprehensive solution that included detailed design support, technical provision, and complex project management across four sites. This ensured the systems were seamlessly integrated and all equipment was delivered on a challenging seven-month timeline. The successful execution and performance led the customer to award Cummins Arabia additional contracts for further site extensions, solidifying their role as a key partner in developing Saudi Arabia's digital infrastructure.
Well-established Regional Technology Provider