The New York Stock Exchange faced the challenge of modernizing its aging broadcast infrastructure, which supported over 3,000 live events annually, with an absolute requirement of zero downtime. Partnering with vendor CTI, the NYSE needed to completely rebuild its production environment, including control rooms and backend systems, without interrupting a single broadcast.
CTI implemented a carefully phased, broadcast-first solution, building a temporary control room and then replacing the entire backend while expanding to three state-of-the-art control rooms. The result was a seamless transformation with not a single missed show. The measurable impact for NYSE includes higher quality video/audio, greater operational reliability, and streamlined workflows that support massive annual event volume with improved consistency and efficiency.