GUI development time cut by 50%, saving 700+ project hours for Valid Manufacturing Ltd.

A Crank AMETEK Case Study

Preview of the Valid Manufacturing Case Study

Case study about Valid Manufacturing working with Crank AMETEK.

View this case study…

Valid Manufacturing

Jack Fenkhuber

Electronics Engineering Manager


Crank AMETEK

13 Case Studies