Cosmo Tech
16 Case Studies
A Cosmo Tech Case Study
The Client, a leader in the nuclear industry, faced the challenge of preparing a realistic annual turnaround plan for 10,000 interdependent tasks amidst complex operational constraints. Their previous plans suffered from inconsistencies, making it hard to identify bottlenecks and ensure feasibility. To solve this, they partnered with Cosmo Tech to implement its Prescriptive Simulation Twin solution, Cosmo Tech Plan.
Cosmo Tech created a digital twin of the planning process that integrated resources like human availability and equipment to crash-test the plan's resilience. Using this solution, the client identified and fixed logistical inconsistencies, virtually tested what-if scenarios, and started their maintenance turnaround with greater confidence. The results included $5M in cost savings, an 80% reduction in preparation time, and mastery of all 10,000 tasks.