Case Study: a leading automotive manufacturer boosts production throughput with Cosmo Tech Supply Chain

A Cosmo Tech Case Study

Preview of the Leading Automotive Manufacturer Case Study

Optimize your manufacturing planning and scheduling Manage complex production sequences and meet the needs of your dynamic supply chain

Cosmo Tech worked with a leading automotive manufacturer whose production manager needed to better schedule and sequence sheet metal production across a complex plant. The challenge was to balance customer service, cost, and utilization while respecting manufacturing constraints, avoiding bottlenecks, and meeting daily production targets.

Using Cosmo Tech Supply Chain, the company deployed a Prescriptive Simulation Twin of the plant and sheet metal line to model flows, constraints, part links, and sequencing rules. Cosmo Tech helped the manufacturer smooth throughput, maximize production capacity, reduce lead time and stock levels, and improve on-time in full (OTIF), though no specific numeric results were provided.


View this case study…

Cosmo Tech

15 Case Studies