Case Study: a $200m equipment manufacturer boosts assembly capacity by 22% with Corporate Education Group

A Corporate Education Group (CEG) Case Study

Preview of the $200m Equipment Manufacturer Case Study

a $200M equipment manufacturer boosts capacity by 22% with Corporate Education Group

The customer, a $200m equipment manufacturer, faced challenges with quality defects and inefficiency in its traditional workbench assembly method. To address this, they engaged the vendor, Corporate Education Group (CEG), and utilized its Lean Six Sigma training services to identify the root causes of these issues.

Corporate Education Group's solution involved training a team in Lean Six Sigma to pilot a move of two products to a modified assembly line. This implementation of greater standardization resulted in a 22% increase in line capacity, a 12.5% reduction in assembly costs, and significant improvements in product quality.


View this case study…

Corporate Education Group (CEG)

8 Case Studies