CoreSite
50 Case Studies
A CoreSite Case Study
A leading shared communications infrastructure provider that serves major news organizations faced a surge in demand for high-definition media transfer. Its existing 1 Gb connection to Microsoft Azure could not keep up with real-time, on-demand reporting, and provisioning additional capacity typically took up to 30 days—far too slow for time-sensitive news workflows.
Using CoreSite colocation and the CoreSite Open Cloud Exchange®, the provider added fast physical fiber links and virtual Azure connectivity to scale from 1 Gb to 10 Gb on demand (physical installs in as little as 72 hours and virtual changes in minutes). The result: 10× bandwidth, connection setup time cut from 30 days to 72 hours, faster and more secure media transmission, and increased revenue potential with an improved customer experience.
Leading Infrastructure Provider