Makeen Energy, a global leader in the energy industry, faced significant challenges due to a lack of integration between its Autodesk Vault and IFS ERP systems. This manual process led to severe data inconsistencies, an unreliable CAD bill of materials, and inefficient workflows. COOLORANGE was engaged to solve these issues with its powerGate and powerJobs solutions.
COOLORANGE implemented a seamless integration that automated the transfer of items, BOMs, and documents between Vault and IFS. The solution eliminated manual data entry, reduced errors to zero, and brought substantial time savings. As a result, Makeen Energy achieved consistent data across systems, optimized its workflows, and significantly increased the quality of its in-house product data management.