Case Study: Danone Poland – Bieruń Plant achieves smarter, more sustainable production with ConnectPoint

A Connectpoint Case Study

Preview of the Danone Poland – Bieruń Plant Case Study

Danone Poland – Bieruń Plant cuts energy losses and boosts efficiency with Connectpoint

Danone Poland's Bieruń Plant faced the challenge of aligning its production with a global sustainability strategy. The plant lacked a centralized performance monitoring system, relied on manual data recording, and had no real-time process visibility or analytical tools for optimization. They partnered with vendor Connectpoint to implement a solution based on the Aveva PI system and the Smart RDM platform.

Connectpoint implemented a central data repository with the Aveva PI System for real-time data collection and a factory resource model. They also deployed the Smart RDM platform for intelligent data management, centralized storage, and automated reporting. This integrated solution digitized processes, increased operational efficiency, and reduced energy losses for the plant.


View this case study…

Connectpoint

21 Case Studies