Case Study: swenex achieves real-time energy data integration with Connect Bridge by Connecting Software

A Connecting Software Case Study

Preview of the swenex Case Study

Leading Swiss Energy Service Company Builds Advanced Data Exchange Using Connect Bridge for Real-time Integration Between Microsoft Dynamics 365 and Sql Server Instances

swenex, a leading Swiss energy service provider, faced the challenge of building a real-time data exchange between its Microsoft Dynamics 365 system and multiple SQL Server instances. The company needed a reliable integration to manage and predict photovoltaic production for 4,600 installations, a process critical for selling renewable energy and avoiding significant financial penalties. To solve this, they turned to the Connect Bridge integration platform from Connecting Software.

Connecting Software implemented Connect Bridge as a central communication point, enabling seamless data flow in under two weeks. The solution resulted in a highly accurate 96% prediction rate for energy production. Most importantly, the platform has run with zero downtime since its launch, which is vital as any failure could result in potential losses of up to 2.3 million Swiss francs per day for swenex.


Open case study document...

swenex

Alexander Zehnder

Chief Technology Officer


Connecting Software

26 Case Studies