Wood Group PSN Canada requested Conbit to perform a feasibility study for the replacement of two platform cranes on the ExxonMobil-operated Hibernia platform. Their challenge was to find an efficient solution for this crane exchange that would avoid the high costs and logistical challenges of using a large offshore crane vessel.
Conbit's solution involved a detailed feasibility study that proposed using a temporary crane, which would be assembled on the platform deck using the existing cranes before their removal. This innovative approach eliminated the need for an expensive external vessel. The Conbit team provided a comprehensive report outlining the temporary crane's position, deck loads, a detailed execution procedure, and a budget estimate, presenting an efficient and cost-effective alternative for the client.