TotalEnergies, operating in the North Sea, faced a challenge installing accommodation units on its K6-P platform because the deck crane and available crane vessels lacked the lifting capacity to operate below the helideck. The company contracted vendor Conbit to provide a specialized lifting solution to overcome this obstacle.
Conbit implemented a temporary modular lifting system using two 15MT winches to safely lift the 44 MT living quarters into position beneath the helideck. The operation was completed successfully and safely in a single day. By utilizing rope access technicians for the installation and support, Conbit ensured the job was executed in a time and cost-efficient manner, enabling a lift that was otherwise impossible with conventional equipment.