Case Study: TotalEnergies completes offshore flare tip replacement with Conbit

A Conbit Case Study

Preview of the TotalEnergies Case Study

TotalEnergies completes OFON2 flare tip replacement 45 km offshore with Conbit

The customer, TotalEnergies (operating as Total E&P Nigeria Limited), faced the challenge of replacing a flare tip on its offshore OFON2 platform with a primary focus on safety and minimizing the required shutdown period. The vendor, Conbit, was contracted by the EPC contractor Ponticelli to perform this flare tip replacement service.

Conbit implemented a unique lifting solution using a system of lightweight aluminum components assembled on the flare tip access platform, which provided an alternative to using helicopters or crane barges. The solution included linking the flare platform to the production platform with a bridge and using a specially designed cradle for transport. The Conbit team successfully executed the project without requiring any structural reinforcements, ensuring safety and minimizing the critical shutdown time.


View this case study…

Conbit

159 Case Studies