Conbit
159 Case Studies
A Conbit Case Study
TotalEnergies approached Conbit for the heavy lifting challenge of replacing the gin pole on their unmanned offshore Kraka platform in Denmark. The client initially considered helicopter lifting but required a more precise and controlled solution for this operation.
Conbit designed and implemented a specialized lifting system for the project, which included an offshore lift boom and a double boom gantry. The vendor's team used this equipment to successfully remove the old gin pole and install the new one from a supply vessel, ensuring safe and timely delivery.