Conbit
159 Case Studies
A Conbit Case Study
The customer TenneT, alongside its service contractor Omexom, required the complex installation of a J-Tube at the Riffgat Offshore Substation, a critical component for protecting subsea cables at their offshore wind farm. Vendor Conbit was contracted to handle the topside installation works for this technically challenging operation.
Conbit implemented a meticulously planned solution using bespoke lifting systems and expert rope access techniques, working in close partnership with N-Sea for the subsea scope. This collaboration led to a successful and safe installation that met the highest quality standards, ensuring the efficient operation of the wind farm and supporting Germany's renewable energy infrastructure.