Case Study: Shell Philippines achieves safe, efficient flare tip replacement with Conbit

A Conbit Case Study

Preview of the Shell Philippines Case Study

Shell Philippines completes flare tip replacement in 2 days with Conbit

Shell Philippines requested Conbit for a second time to replace a flare tip on their Malampaya gas facility offshore Palawan Island. The challenge involved executing this replacement safely and efficiently despite spatial constraints on the platform and various COVID-19 restrictions.

Conbit engineered a mechanical handling solution using a configured lifting system to lower and retrieve the flare tip, performing an in-air handover of the load to a deck crane. The project was completed by Conbit in a couple of days after arrival on site. The flare tip replacement was finished safely, on budget, and within the set timeframe, a success attributed to the real team effort between Conbit and the Shell Philippines team.


View this case study…