The customer, Shell Global, faced the significant challenge of replacing a large, eight-tonne hydraulic main jack assembly located deep within the highly confined and congested turret buoy of its Stones FPSO. Vendor Conbit was contracted to provide all lifting and handling support for this complex operation.
Conbit engineered a safe lifting strategy utilizing multiple rigging lines, chain hoists, and a compact hydraulic power unit to maneuver the jack through the constrained space. This solution, developed in close collaboration with specialists, enabled the team to complete the work safely, with no injuries or loss of containment, and even ahead of schedule. The project's success by Conbit confirmed the feasibility of future replacement campaigns on the FPSO.