Conbit
159 Case Studies
A Conbit Case Study
The customer, Seajacks Zaratan, faced the challenge of safely fastening and transporting massive 500-700 tonne monopiles on their jack-up vessel for an offshore wind project, and then moving them into the crane's reach for installation. The vendor, Conbit, was contracted to provide a complete monopile handling and skidding solution to meet these demanding requirements.
Conbit engineered a system using grillages positioned three meters above deck and a hydraulic tensioning system to secure the monopiles during transit. For the skidding operation, they implemented an unconventional solution using SPMTs (Self-Propelled Modular Trailers) to move the monopiles across the deck. The vendor, Conbit, also managed the entire procurement and certification process. The solution was successfully installed and tested, enabling the Seajacks Zaratan vessel to depart and install 78 foundation piles for the Meerwind offshore wind park.