Case Study: Qatar Petroleum achieves efficient boat landing replacement with Conbit

A Conbit Case Study

Preview of the Qatar Petroleum Case Study

Qatar Petroleum replaces 5 boat landings in 4 months with Conbit

Qatar Petroleum required the replacement of five large boat landings at their NFA Complex in Ras Laffan, Qatar. Each structure weighed over 100 tonnes, and the customer needed a time-efficient solution to minimize platform disruption. They awarded the project to Dopet, who subsequently requested Conbit to provide a suitable process and the necessary installation services for the execution.

Conbit designed and fabricated custom 60-tonne pneumatic chain hoists and storage frames for the project. A crew of 13 executed the lift, disconnecting the old structures and rigging the new ones into position for bolting and welding. Despite delays from weather and COVID-19, the project was a complete success. Qatar Petroleum was highly impressed with Conbit's flexibility and professionalism throughout the job.


View this case study…

Conbit

159 Case Studies