PTTEP replaces Erawan flare tip with Conbit in under a tight shutdown window

The customer, PTTEP, faced the challenge of replacing a large flare tip on their Erawan facility in the Gulf of Thailand during a narrow shutdown window. The location on a bridge not designed for lifting presented significant logistical and engineering hurdles. Vendor Conbit, alongside partner CR3, was contracted to provide a flare tip replacement service to overcome this.

Conbit configured a specialized modular lifting system constructed from lightweight, hand-carriable components to solve the access issue. This system, paired with high-speed winches and a skilled crew, enabled the safe and precise replacement of the 2.2-ton flare tip. The project was completed successfully by Conbit and CR3 ahead of schedule and within budget, reinforcing a trusted partnership that has included multiple such projects for PTTEP.


View this case study…

Conbit

159 Case Studies