Case Study: Mabruk Oil Operations installs shelter and helideck on BD-1 Platform with Conbit

A Conbit Case Study

Preview of the Mabruk Oil Operations Case Study

Mabruk Oil Operations completes shelter and helideck installation in 28 offshore days with Conbit

Mabruk Oil Operations required the transport and installation of an emergency shelter module and a helideck onto their BD-1 offshore platform in Libya. They awarded the contract to Conbit due to the vendor's extensive offshore experience for this challenging lifting project.

Conbit's solution involved detailed engineering preparation and a team of 21 personnel. Using equipment like strand jacks and lift winches, the vendor successfully completed the installation within 28 offshore days. The project was a success, proving the effectiveness of Conbit's alternative approach combining solid engineering with a competent implementation team.