Case Study: Liandon, Novec and WL Winet extend high voltage pylon capacity with Conbit structural reinforcement

A Conbit Case Study

Preview of the Liandon, Novec, WL Winet Case Study

Liandon, Novec, and WL Winet extend high-voltage pylon load capacity with Conbit in a 20-year engineering track record

The customer, Liandon, Novec, and WL Winet, contracted the vendor Conbit to extend the load-bearing capacity of several high voltage pylons. Their challenge was that the existing pylons lacked the necessary structural strength and required reinforcement.

Conbit's engineers performed a structural analysis and then provided a complete engineering solution. This included designing and calculating the necessary adjustments, such as adding L-profiles and replacing parts, as well as strengthening the foundations. As a result of Conbit's solution, the high voltage pylons' load-bearing capacity was successfully extended to meet the customer's requirements.


View this case study…

Conbit

159 Case Studies