Case Study: GSP Saturn achieves a successful king post load test with Conbit

A Conbit Case Study

Preview of the GSP Saturn Case Study

GSP Saturn completes king post load test to 25 mT with Conbit

The drilling rig GSP Saturn required a short-notice load test for two of its king posts during a port visit. The customer awarded this turnkey project to vendor Conbit, who was tasked with providing the necessary engineering, equipment, and crew to assess the structural integrity of the components.

Conbit designed the test configuration and utilized its modular aluminum lifting structure with water-filled load bags to apply a precise load. The solution was successfully executed, with the vendor applying a load of 25 metric tons at a 59-degree angle for 15 minutes. A subsequent examination confirmed no defects, cracking, or deformations, resulting in a successful load test for GSP Saturn.


View this case study…

Conbit

159 Case Studies