ExxonMobil completes a 4-ton flare tip replacement in 5 days with Conbit

ExxonMobil commissioned Conbit to replace an existing flare tip on its Marlin B offshore platform in Australia. The challenge was to safely remove the old 3-tonne flare tip and install a new, heavier 4-tonne unit during a limited shutdown period.

Conbit prepared an extensive solution involving a custom gantry-type lifting structure. Their method involved lowering the old flare tip directly onto a supply vessel. Through meticulous preparation, including feasibility studies and load testing, the project was completed successfully by a crew of five within the five-day shutdown window, demonstrating Conbit's expertise in flare tip replacement services.