Conbit
159 Case Studies
A Conbit Case Study
The customer, ERSAI, faced the challenge of replacing two large flare tips that had reached the end of their performance life on D Island in Kazakhstan's Kashagan field. The project had an extremely tight shutdown window, so they required a safe and fast execution. They turned to the vendor, Conbit, for its expert flare tip replacement services and tailored lifting solutions.
Conbit engineered and certified a mechanical handling plan prior to the shutdown, which utilized a gantry structure built on the flare tip access platform. The vendor successfully replaced both the high-pressure flare tip, which set a world record at 10,000kg, and the low-pressure flare tip in just six hours each. This efficient execution by Conbit ensured the critical maintenance was completed on schedule.