Conbit
159 Case Studies
A Conbit Case Study
The customer, ERSAI, required a flare tip replacement at its onshore processing facility in the Kashagan oil field. ERSAI engaged the vendor, Conbit, to provide its expert flare tip replacement services as an alternative to using expensive cranes for the project.
Conbit engineered a custom lift system that was secured to the existing flare tip access platform. Using this modular equipment, the crew successfully removed the old high-pressure and low-pressure flare tips and installed the new ones. The Conbit team completed the project safely and efficiently, returning the processing facility, which handles oil from one of the world's largest fields, back to full operation.