Case Study: ENGIE achieves successful crane pedestal replacement with Conbit

A Conbit Case Study

Preview of the ENGIE Case Study

ENGIE completes crane pedestal replacement in 1 project with Conbit

ENGIE E&P Nederland B.V. faced a challenge on its L10-E platform in the North Sea, requiring the replacement of a crane pedestal. The major obstacle was a lack of lifting capacity at the old pedestal's location. The vendor Conbit was commissioned to provide a combination of structural design, lifting, and mechanical works to solve this issue.

Conbit implemented its special lightweight lift boom to successfully remove the old pedestal. This solution also served as a temporary crane until the new one was installed. The use of lightweight structures ensured the platform was not overloaded and minimized on-site work. Conbit's combination of engineering, lifting, and mechanical handling competencies led to a smooth operation and a successful project outcome for ENGIE.