Case Study: Dow Benelux achieves stronger overhead crane support with Conbit

A Conbit Case Study

Preview of the Dow Benelux Case Study

Dow Benelux boosts overhead crane capacity from 1 to 2 trolleys with Conbit

The customer, Dow Benelux, needed to replace an overhead crane and commissioned the vendor Conbit to calculate a new support structure. Their challenge was to upgrade the system by replacing two older cranes with a new one that had a greater capacity, which required ensuring the existing support structure could handle the increased load.

Conbit provided a comprehensive engineering analysis and calculation report for the new support beams. The solution was designed according to Euro Code and ISO 12488-1 standards, which verified the strength and stability of the structure for the new crane. As a result, Dow Benelux successfully increased the overhead crane capacity in the area.