The customer, Dana Petroleum PLC, faced the challenge of performing critical maintenance on the flare installation of its Hanze platform in the North Sea. The major activities required were the replacement of a high-pressure flare tip and the installation of new conduit piping. For this project, Dana contracted the vendor Conbit to utilize its flare tip replacement services.
Conbit executed the solution by employing specialized lifting concepts and a team of IRATA rope access technicians to safely replace the 536 kg flare tip located 77 meters above the deck. The vendor's team completed all preparations and the shutdown operation within a total of 13 days. The successful project resulted in the replacement of the flare tip and associated lines, ensuring the platform's safe and efficient operation with a strong focus on safety and pre-tested procedures.