ALE, a heavy transport and logistics company, was awarded a project to transport transition pieces for the Hornsea 1 offshore wind farm. Their challenge was to determine if and how their existing grillages needed to be adjusted to safely carry these specific components on a barge. They engaged Conbit for its structural engineering and transport solutions expertise.
Conbit conducted a full structural analysis to verify the integrity of the transport frames, performing stress checks on the barge, transition pieces, and grillages. The vendor provided detailed engineering drawings outlining the necessary adjustments to make the existing X-frames suitable for the project. This collaboration allowed ALE to successfully utilize its equipment for the transport, demonstrating the strength of the partnership between the two companies.