Case Study: Pinehurst Manufacturing achieves reduced lead times and controlled growth with Coats Digital's Evolve planning solution

A Coats Digital Case Study

Preview of the Pinehurst Manufacturing Case Study

Pinehurst Manufacturing selects Fast React’s manufacturing planning system to provide foundations for further controlled growth

Pinehurst Manufacturing is a leading sports apparel maker with operations in Honduras and Nicaragua, supplying global brands such as adidas, Reebok and Puma. As part of a plan to double the business in five years, Pinehurst needed to replace manual, disconnected planning methods with systems that deliver faster access to accurate information, greater visibility and control, increased flexibility and reduced lead times.

They selected Fast React’s Evolve planning and control system — a modular, highly visual solution that provides a single point of reference and simultaneously manages capacity, pre‑production critical paths and materials (including MRP), with high‑level “control tower” and detailed line‑level planning across both plants. With rapid implementation and integrated alerts, Evolve is expected to provide the foundations for controlled growth by improving coordination and planning accuracy, reducing lead times and costs, and supporting consistently strong delivery performance.


Open case study document...

Pinehurst Manufacturing

Martin Lowe

CFO


Coats Digital

117 Case Studies