cmBuilder.io
45 Case Studies
A cmBuilder.io Case Study
The Eastern Freeway Burke to Tram Alliance (EFBTA) was faced with the challenge of managing the immense scale and coordination of a multi-billion dollar infrastructure project with over 1,000 people across various sites. EFBTA needed to move away from traditional, difficult-to-interpret 2D planning methods to improve collaboration and ensure seamless execution. To address this, they leveraged cmBuilder's 4D digital engineering and site logistics platform to visualize complex construction plans and streamline coordination across distributed teams.
By implementing cmBuilder, the alliance empowered its delivery teams to become self-sufficient in planning. The solution provided scalable access to a detailed resource library and earthworks modeling capabilities, enabling teams to conduct their own space-proofing and test scenarios in 3D. This resulted in reduced errors, more informed decision-making, and enhanced client confidence. cmBuilder's technology proved invaluable for improving the accuracy of site planning and overall project coordination on one of Victoria's most ambitious infrastructure projects.
Stephen Corney
Principal Design Digital Engineer