Case Study: Blythe Construction speeds up highway layout with Civ Robotics’ CivDot Mini

A Civ Robotics Case Study

Preview of the Blythe Construction Case Study

Blythe Construction cuts highway layout from 8 hours to 2 with Civ Robotics

Blythe Construction, a leading heavy civil contractor, faced significant challenges performing road layout on the I-485 Express Lanes project. Their survey team struggled with slow, manual methods that required 7-8 hours per mile for a crew of 2-3 during night shifts, creating bottlenecks and opportunities for human error while trying to meet strict accuracy requirements.

Civ Robotics provided its CivDot Mini robot to automate the layout process. The solution reduced layout time from 8 hours to just 2-3 hours with a single operator, achieving sub-inch precision from digital design files. This deployment by Civ Robotics eliminated a major constraint, speeding up overall project progress while improving both consistency and safety.


View this case study…

Civ Robotics

13 Case Studies