Case Study: M3 Design Group achieves more accurate QA/QC and scan-to-BIM workflows with Cintoo Cloud

A Cintoo Case Study

Preview of the M3 Design Group Case Study

M3 Design Group trains teams in hours and manages 20,000+ scans with Cintoo

M3 Design Group, a New Orleans-based architecture firm, faced a challenge in maximizing the efficiency and accuracy of its point cloud scan to BIM workflows for a complex stadium construction project. To address this, the firm turned to vendor Cintoo and its Cintoo Cloud service.

By implementing Cintoo Cloud, M3 Design Group was able to validate models with a visual comparison tool and tag issues with precise 3D points. The results included a vastly improved QA/QC process, the ability to collaborate with an unlimited number of technical and non-technical team members, and the capacity to manage over 20,000 scans for the stadium project. Cintoo provided the solution that allowed the firm to accurately track issues and deliver verifiable results to clients.


View this case study…

Cintoo

38 Case Studies