Lilly France faced the challenge of upgrading its HVAC system within a live pharmaceutical manufacturing plant. The project required extreme precision to avoid disrupting ongoing production in the GMP-regulated environment, compounded by limited visibility into the site's dense, existing infrastructure. To mitigate the risk of clashes and ensure compliance, they worked with vendor Cintoo, leveraging its cloud platform for reality capture data management.
Using Cintoo, the project team combined reality capture scans with 3D design models to create a single source of truth. This allowed them to validate the new HVAC routing against real-world conditions virtually before construction began. The solution from Cintoo reduced uncertainty and risk, improved stakeholder coordination, and enabled informed decision-making, resulting in a smoother upgrade with no unnecessary disruption to pharmaceutical operations.