Case Study: Lilly France achieves safer HVAC upgrade and smoother GMP compliance with Cintoo

A Cintoo Case Study

Preview of the Lilly France Case Study

Lilly France reduces HVAC construction risk in a live GMP plant with Cintoo

Lilly France faced the challenge of upgrading its HVAC system within a live pharmaceutical manufacturing plant. The project required extreme precision to avoid disrupting ongoing production in the GMP-regulated environment, compounded by limited visibility into the site's dense, existing infrastructure. To mitigate the risk of clashes and ensure compliance, they worked with vendor Cintoo, leveraging its cloud platform for reality capture data management.

Using Cintoo, the project team combined reality capture scans with 3D design models to create a single source of truth. This allowed them to validate the new HVAC routing against real-world conditions virtually before construction began. The solution from Cintoo reduced uncertainty and risk, improved stakeholder coordination, and enabled informed decision-making, resulting in a smoother upgrade with no unnecessary disruption to pharmaceutical operations.


View this case study…

Cintoo

38 Case Studies