Case Study: a large biopharmaceutical manufacturer reduces energy waste with CIM's PEAK platform

A CIM Case Study

Preview of the Large Biopharmaceutical Manufacturers Case Study

Solving Excessive Dehumidification Uncovers Unusual Anomaly

The biopharmaceutical manufacturer was experiencing operational inefficiencies, which CIM investigated using its PEAK platform analytics. The platform uncovered a critical anomaly where an air handling unit was simultaneously dehumidifying and humidifying, wasting significant energy.

CIM's analysis identified that the issue was caused by corrupted control logic between two separate building management systems. After the control logic was reconfigured, the conflict was resolved. This solution provided by CIM resulted in substantial energy savings and increased the equipment's life expectancy by reducing its operational strain.


View this case study…

CIM

37 Case Studies