A large commercial building company sought to reduce unnecessary heating energy and gas consumption during warmer months. The customer, a user of CIM's PEAK Platform, already had a boiler lockout strategy but needed to refine it further to optimize efficiency without sacrificing occupant comfort.

CIM used its PEAK Platform analytics to provide data-driven recommendations. The solution involved implementing refined boiler lockout thresholds and optimizing pump schedules, which prevented unnecessary operation. This resulted in a reduction of approximately 164 hours of boiler runtime and energy savings of around 750 kWh, proving that small, strategic adjustments by CIM can yield significant efficiency gains.