A CIM Case Study
The customer, a leading medicines company that is a large biopharma plant, faced a challenge where an Air Handling Unit (AHU) was not maintaining the required temperature and humidity for its compliant production areas, threatening the integrity of valuable biomedicine products. CIM's PEAK platform, a Fault Detection and Diagnostics (FDD) software, identified this critical issue with the supply air temperature and chilled water valve before the site's own alarm system was triggered.
CIM's solution used real-time data to diagnose the operational non-compliance and guide onsite maintenance technicians to a blockage in a water strainer, which was rectified. This action returned the zone conditions to their required setpoint, preventing a non-compliant event and the potential loss of product. CIM's predictive maintenance approach successfully averted a breakdown that would have otherwise occurred.