Alton Towers Resort, the largest theme park in the UK, faced a major energy challenge across its 550-acre site, which includes hotels, a conference centre, and Europe’s largest waterpark. With high power and heating demands, the resort needed a way to reduce energy costs, improve sustainability, and future-proof energy pricing. Centrica Business Solutions provided a combined heat and power (CHP) solution.

Centrica Business Solutions installed an 850kW CHP unit, along with variable speed drives and cloud-based monitoring, to generate power on site and reduce transmission loss. The result was an estimated 12% annual energy saving and around 80% energy efficiency, helping Alton Towers Resort cut carbon levy exposure and protect future energy costs.


Open case study document...

Alton Towers Resort

Warren Critchley

Head of Facilities


Centrica Business Solutions

42 Case Studies