Case Study: Accurate Firestop and Insulation achieves strict hospital compliance and flawless project tracking with On Center Software

A On Center Software Case Study

Preview of the Accurate Firestop and Insulation Case Study

A Desirable Design-Build Hospital Project had Strict Requirements that were met with Quality Workmanship & Automation

Accurate Firestop and Insulation, a Hayward, CA firestopping and insulation contractor, was hired for the complex, design-build Sutter Medical Center hospital project (185,000 sq ft) that demanded strict OSHPD-style compliance, detailed penetrations work for multiple trades, and frequent change orders. To avoid missed scope and ensure accurate takeoffs across architectural, mechanical, electrical and plumbing drawings, Accurate Firestop and Insulation turned to On Center Software and its On-Screen Takeoff® solution.

On Center Software’s On-Screen Takeoff® automated AFI’s estimating and tracking processes, allowing the team to manage change orders flawlessly, control scope across all trades, and meet the project’s tight quality and timing requirements on this 16-month, $284M job. The software helped ensure compliant, high-quality workmanship and contributed to AFI’s strong business performance and repeat-customer rate.


Open case study document...

On Center Software

50 Case Studies