The Danish Crown site in Bugle partnered with Carbon Desktop to optimize factory operations and reduce energy consumption. The challenge was to lower electricity usage while also managing an increase in production throughput.
By implementing Carbon Desktop's solution, the team focused on improving the control of energy-intensive equipment like vacuum pumps and refrigeration. Carbon Desktop helped them build in automatic controls to turn off equipment when not in use, leading to a 19.5% reduction in electricity consumption and annual savings of over £200,000, despite a 6% increase in throughput.
Colin Sleeman
Engineering Manager