Valagro, a leading producer of biostimulants and nutritional specialties for plants, wanted to improve sustainability while reducing reliance on the less reliable national grid at its Atessa, Italy facility. The company needed a low-emission onsite heat and power solution that could also cut micro-interruptions and blackouts; Capstone Green Energy’s microturbine technology was selected for the project.

Capstone Green Energy, working through dealer IBT Group, installed a CHP microgrid based on two Capstone C200 microturbines, rotating UPS, and supporting gas burner systems. The system now delivers prime power and useful heat for Valagro’s operations, producing about €230,000 in annual savings, 4,200 MWh of energy savings per year, and around 1,000 tonnes of CO2 avoided, while also reducing production losses from power outages.


Open case study document...

Capstone Green Energy

110 Case Studies