Case Study: Rizwan Bhiriya captures a 4-year construction time-lapse with CamDo Solutions

A CamDo Solutions Case Study

Preview of the Rizwan Bhiriya Case Study

Rizwan Bhiriya captures a 4-year construction time lapse with CamDo Solutions

Rizwan Bhiriya, an artist and filmmaker, faced the immense challenge of capturing a reliable multi-year construction time-lapse of Pakistan's first dedicated coal, clinker, and cement terminal. The project spanned four years and 500 hectares, requiring a solution that could avoid malfunctions and data loss over the long term. He used equipment from CamDo Solutions to undertake this project.

CamDo Solutions provided its time-lapse intervalometers and programmable schedulers (now replaced by BlinkX) to enable the successful capture. The solution resulted in the recording of over 27 million minutes of construction, producing more than 3 million images to create the final time-lapse. Bhiriya credited CamDo's support in overcoming technical hiccups as a major reason for the project's successful completion.


View this case study…

CamDo Solutions

68 Case Studies