Case Study: Goelzer Industries captures a high-quality construction time-lapse installation video with CamDo Solutions

A CamDo Solutions Case Study

Preview of the Goelzer Industries Case Study

Goelzer Industries captures a 3.5-week equipment installation with CamDo Solutions

CamDo Solutions enabled Goelzer Industries, a leading printing company, to document the complex installation of a high-speed envelope printing machine. The customer needed a reliable, unattended time-lapse system to create a clear visual record for marketing, stakeholder communication, and post-project analysis over a 3.5-week installation period.

The solution involved deploying two CamDo time-lapse camera systems, powered by CamDo’s CloudX platform for remote management and image uploads. Strategically mounted in the ceiling, the cameras captured a frame every five minutes during work hours, providing comprehensive coverage. Despite power and network challenges, the system successfully captured the entire process, which was then edited into high-quality 4K video sequences. The final time-lapse videos served multiple purposes for Goelzer Industries, including marketing content and a precise record of the installation.


View this case study…

CamDo Solutions

68 Case Studies